Missing design information
Record what was visible, what remains unknown and which checks must be completed before work starts.

Capture proposed equipment locations, visible supplies, distribution-board details, cable routes, access constraints and outstanding verification items in one professional survey report.
No charge today · Use every feature in your chosen plan · Cancel before day 14Record what was visible, what remains unknown and which checks must be completed before work starts.
Photograph proposed locations, route restrictions, work-at-height requirements and delivery constraints.
Give the estimator, designer and delivery team the same structured survey instead of separate messages and photos.
Explore the workflow as you scroll.
Record the location and the finding while you are on site. Keep the detail beside the observation, ready for the next person.
Attach photographs and documents to the finding they support. Annotate the detail so the person reviewing it knows where to look.
Give each action an owner, priority and due date. Team workspaces keep the survey and its follow-up connected.
Review the findings, evidence and actions. Choose your company branding and report layout, then create the PDF in the app.
Record the proposed supply point and what still needs verification.
Start with prompts for footprint, power, data, drainage, access and route constraints.
Keep switchgear, routes, proposed positions and constraints beside the relevant finding.
Identify critical unknowns and give outstanding verification work an owner and due date.
Issue a consistent branded record to the estimator, designer, client or delivery team.
Record the client requirement for two additional twin sockets at a reception workstation, the visible site conditions and the information still needed for design and pricing.
Fictional example showing how to record observations and follow-up actions.
Ground floor plant room
Electrical designerBefore design approval
Plant room to reception
Survey leadBefore the quotation is finalised
Reception workstation
Project coordinatorBefore scheduling installation
Include the site and survey reference, scope, findings, supporting evidence, action owners and target dates. Review outstanding items and limitations before sharing the PDF. In a Team workspace, use the optional approval workflow to have a manager review the record.
Fictional pre-installation planning example only. No live work, isolation, electrical testing or design calculations have been undertaken. This is not an EICR, installation certificate, minor works certificate or instruction to carry out electrical work.
No. It is a site survey and reporting tool, not electrical certification software. Required inspection, testing, design and certification must still be completed by competent people using the appropriate documents.
You can record proposed equipment, visible supplies, distribution boards, routes, access, constraints, photographs and outstanding verification actions.
Yes. Companies can create reusable templates with their own checks, prompts and expected findings.
Download the step-by-step guide for account setup, templates, evidence, offline working, actions and reports.
Use the complete product, create a genuine report and decide whether it improves your workflow before the first payment.